GreenSensor by Prosensor

Documentation

From the gateway to your first alert: the installation, in order.

Plug in the gateway

Plug it into the mains with its power cable and wait 1 to 2 minutes. Place it on site, as close to the probes as possible.

Connect it to the Internet

The simplest and most reliable option: a cable between your router and the gateway.

  1. Plug the Ethernet cable between your router and the gateway.
  2. That's all: it connects by itself within 1 to 2 minutes.

Check the connection

The gateway's three lights should look like this.

Switch on and push in the probe

The gateway is ready: you can now install the probes.

  • Press the button on the housing for 5 seconds to switch the probe on.
  • Push it in by hand, using the two handles, into the core of the windrow.
  • Aim for at least 50 cm deep, ideally between 80 cm and 1 m.
  • Keep the same spot for the whole campaign.

Objectives, phases and campaign

  1. Create your temperature objectives.
  2. Use them in your phases: fermentation, hygienisation and maturation.
  3. Then create a campaign and link the probe to its windrow.
  4. Follow live data, get SMS or e-mail alerts and export reports.

Need help?

A Prosensor advisor will answer by phone or e-mail.

Request a demo